OSHKOSH, Wis–Repair work on the Jackson and Oregon Street Bridge in downtown Oshkosh is on hold. Public Works Director James Rabe says the Department of Transportation is waiting on important parts……………….
The drawbridge has been stuck in the partially-open position for two weeks after the discovery of gear damage during a routine inspection. A timetable for reopening has not been set.



